Draft for review — not public and not indexed by search engines.

Results

Proof of concept

The technology has been validated at laboratory scale in both municipal and mining wastewater. All results below are lab-scale; pilot validation is the next step.

Municipal wastewater

3×higher biological activity than conventional systems
Up to 75%reduction in infrastructure footprint
Up to 40%less sludge, by eliminating excess biomass generated for sludge wasting
~100 mgP/Lphosphorus-rich streams produced without additional unit processes

More on municipal applications →

Mining wastewater

2–3×higher sulfate removal rates, enabling smaller reactor volumes
95–100%recovery of dissolved metals (e.g. Cu, Zn, Ni, Co, rare earth elements)
Up to 85%less waste sludge than non-entrapped sulfate-reducing bacteria systems
Stableunder low pH, high metal conditions, and temperature and environmental fluctuations

More on mining applications →

Next: pilot validation

We are now advancing the technology readiness level through pilot demonstrations. Pilot partners help shape how the technology is tested and deployed in real operating conditions.

How to become a pilot partner →

Interested in a pilot or co-development partnership?

We are looking for industry partners to take this technology from the lab to pilot scale. Partners gain early access and preferential positioning in future commercialisation.